NAF 4.1-view C8: Planning Constraints
C8 — Planning Constraints
Purpose & Usage
The C8 Viewpoint is concerned with the identification and description of assumptions (Strategic Constraints).
- Capability Planning.
- Planning Assumptions.
- Implementation Planning.
Scope
- Shall contain Capabilities relevant for the entity of interest.
- Shall contain Strategic Constraints that apply to the Capabilities.
- May show Strategic Rationale relating to Strategic Constraints.
- May show Effects the Capabilities desire.
- May show the Vision that requires the Capability and the Goal it specifies.
Representation
- Tabular.
- Benefits diagram.
- Parametric diagram.
Cut-out (Meta-model)
flowchart TB
StrategicConstraint["Strategic Constraint"]:::naf
Capability:::naf
EnterpriseVision["Enterprise Vision"]:::naf
StrategicRationale["Strategic Rationale"]:::naf
Effect:::naf
Goal:::naf
StrategicConstraint -->|"applies to"| Capability
EnterpriseVision -->|"requires"| Capability
StrategicConstraint -->|"originates from"| StrategicRationale
Capability -->|"desires"| Effect
EnterpriseVision -->|"specifies"| Goal
classDef naf fill:#C5E0B4,stroke:#385723,color:#000
Notes on the Cut-out
Planning Assumptions, as defined in NAFv3, are represented as a Strategic Constraint (an assumption has a lesser level of rigour than a constraint).
NAFv4 Compliant Example
flowchart LR
C1["«Constraint» Search covers radius of 10 km in 3 simultaneous missions"]:::naf
C2c["«Constraint» C2 unit must be permanently available"]:::naf
MaritimeSAR["«Capability» Maritime SAR"]:::naf
C1 -->|"applies to"| MaritimeSAR
C2c -->|"applies to"| MaritimeSAR
classDef naf fill:#C5E0B4,stroke:#385723,color:#000